Developed by electrical & instrumentation plant engineers. Four integrated edge and AI platforms targeting critical spares, shift workforce analytics, short interval control, and operational pricing.
Fully functional and live on dedicated edge subdomains under dashlo.in.
Mining & beneficiation spares inventory forecasting, automated JIT re-ordering triggers, bin allocation, and proof-of-delivery tracking.
Shift roster governance, plant contractor biometric audit trails, real-time underground crew distribution, and contractor billing checks.
Hourly operational cycle monitoring, ore extraction throughput tracking, equipment stoppage diagnostics, and bottleneck alarms.
Python-powered pricing engine modeling real-time energy tariffs, milling power draw, consumables, and ore processing cost models.
Operational domain leads across Mining Asset Integrity, Electrical Systems, and Process Instrumentation.
Mining Asset Integrity | Electrical - Mining
Specializing in underground mine-level power distribution, heavy equipment electrification logic, substation reliability, and critical asset integrity.
Mining Asset Integrity | Electrical - Mining
Focusing on high-voltage switchgear architectures, motor control centers (MCC), predictive motor failure detection, and continuous uptime optimization.
Mining Asset Integrity | Electrical & Instrumentation
Specializing in PLC/SCADA control logic, 18-point safety interlocks, Modbus telemetry integration, transmitter loops, and downstream process automation.
Calibrated to Hindustan Zinc's true enterprise volumes: 1.05 Mt metal capacity, ₹1,800 Cr spares inventory, and ~20,000 contract personnel across mining & smelting clusters.
Automating demand forecasting for next 3-6-12 months, converting non-moving/slow-moving inventory, and providing predictive PR recommendations with >90% forecast precision.
| Track & Platform | Owner / SPOC | HZL Enterprise Baseline | AI Hackathon Target KPI | Estimated HZL Financial Delta |
|---|---|---|---|---|
| SETU Suite | Neha Pacholi | ₹1,800 Cr Spares & Consumables Base | ≥10% Gross Reduction, -20% SMI, >95% Spares Avail. | ₹180 – ₹270 Cr Cash Flow |
| Project DRONA | Mohammad Ali | ~20,000 Contract Workforce Records | 10-15% Productivity Lift, Zero Unmanaged OT | ₹70 – ₹105 Cr OPEX Savings |
| ARJUNA SIC | Dushyant Tailor | 51 T Mined Metal / Person / Year | Target: 60 T/Person/Yr (+15% Face / HEMM Util.) | ~176,000 T (+₹4,400 Cr Gross Mined Metal) |
| DRISHTI Engine | Kunal Gupta & Aisha Goklani | ~850,000 MT Domestic Zinc/Lead Sales | MoM Demand Sensing, Import Parity & Premium Capture | ₹85 – ₹170 Cr EBITDA Margin |